PGARC Work List – 2020


Priorities

1- NH project – do other on site work at the same time

2- George – end of June (before bugs get bad up there)

3- Fraser Mtn power

4- Pilot, Carney, Tabor, D-Star – work them in around the out of town projects


Projects

    1. George (end of June)

      1. Solar upgrade (equipment on site)

      2. Move antenna to other corner of the building

      3. Second string of batteries

    2. Fraser

      1. NH project

      2. AC power upgrade

      3. Battery charger

      4. Generator installation

      5. Remove junk building

      6. Remove good building

      7. PV array

      8. Remove unused antennas & relocate the working ones

    3. Tabor

      1. PV array?

      2. Complete the generator installation

      3. Data link from Pilot using our equipment (will be replaced later on NH project)

      4. Lock turns in the radio building door

      5. Roundup for the brush around the buildings

      6. Put Andy's antenna in the diesel building

      7. Grounding on the bed-spring antenna array

      8. Paint the doors

      9. Control cable between the 2 buildings

    4. Pilot

      1. NH project

      2. Batteries

      3. PV array?

    5. Sinkut

      1. NH project

      2. Charger

      3. PV array?

    6. Murray Ridge

      1. Battery, charger, fuse panel

    7. Lucille

      1. RF filter to fix Valemount link

      2. Brush clearing

    8. Boer

      1. NH project

      2. Charger

      3. Remove unused antennas

    9. Carney

      1. Change router to NH unit

      2. Fix Internet link to/at EMBC

    10. Other

      1. Move D-Star repeater from UNBC to UHNBC

      2. Remove data link to UNBC

      3. Remove antenna from Phoenix building?

      4. Remove Penny APRS site

      5. Remove tower on McBride Peak? (An old request that we forgot about)